GENERAL   EQUIPMENT   INC.                    

 

8770 Sunset Drive #191 Miami FL 33173 · USA                                  

7                                                  
Email:
info@generalequipment.infowww.generalequipment.info                                                       


 

 

  WASTE TO ENERGY

 

 

TYPE:

Waste

DESCRIPTION:

Waste to Energy

PRICE:

Upon Request

PACKING:

Ex-Depot

 

 

modular waste to energy plant

Subject unsold or market withdrawal

Modular Waste-to-Energy Plant – 1.9 MW | Almost New | Available Immediately
 

 

So if your buyer is real, quick and can match the offer it is his for this absolute give away price .

Bear in mind, this plant price new is about 13 million – so a very good price.

On top, the plant is now fully dismantled and packed, so the buyer saves about 400.000 / 500,000  € on disassembling.

 

Be very quick 

         

We are pleased to present an exceptional opportunity to acquire a modular Waste-to-Energy Plant manufactured in 2023, with only 3,000 operating hours .
 

The system is designed for municipalities, industrial operators, and healthcare facilities seeking sustainable, on-site energy recovery from municipal, industrial, or sterilized medical waste.

Key Highlights:.com

·         Thermal output: 1.9 MW

·         Steam production: 2.9 t/h at 155 °C, 12 bar(g)

·         Waste treatment capacity: 2,400 t/year

·         Fully containerized, modular design (approx. 1,024 mē)

·         Full PLC automation and remote monitoring

·         Fully compliant with EU Directive 2010/75/EU

·         Immediate availability

Commercial Conditions:

·         Price: € 11,000,000 (EXW Germany)

  • Fully disassembled, ready for transport

·         Costs incl. transport, and reassembly

·         Pre-inspection possible under standard escrow conditions

·         Validity: 15 days from the date of issue or if sold

This offer represents a rare chance to obtain an almost new, high-efficiency WtE unit at a fraction of the original factory cost.
 

Detailed technical documentation and serial data can be shared upon receipt of a signed Letter of Intent (LOI) and Proof of Funds (POF) and 10% deposit into escrow.
 

Please find the full Soft Corporate Offer (SCO) below for your review.
 

Should you be interested, we would be pleased to arrange a call or inspection visit at short notice.

 

See details at:

 

SCO_Modular Waste-to-Energy Plant  almost NEW  3 000 h_12_25.docx

 

Specification and photos are not contractual and are subject to verification upon inspection

 

TAKE NOTICE!

 

PLEASE BE ADVISED THAT INFORMATION INCLUDED IS CONFIDENTIAL IN NATURE AND IS BASED ON PRE-EXISTING BUSINESS RELATIONSHIP WITH THE LEGAL OWNER OF PROPERTY DESCRIBED HEREIN (IF APPLICABLE). AS SUCH, UPON RECEIPT OF SAID INFORMATION THE RECEIVER ACKNOWLEDGES THAT ANY UNAUTHORIZED CONTACT WITH SAID LEGAL SELLER WILL BE CHARACTERIZED AS A BREACH OF CONFIDENTIALITY AND SAID AGREEMENT MAY BE ENFORCED UNDER EXISTING LAW OR IN EQUITY.

 

This paper was prepared by General Equipment Inc.
The paper represents an offer of a partner of General Equipment Inc.
All rights are reserved by and for General Equipment Inc.
All content and ideas of this paper are the property of General Equipment Inc.